page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45 page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
< prev - next > Transport and infrastructure Road building roadworks in emerging economics 2012 (Printable PDF)
Intermediate Equipment Handbook
Intech Associates
The system allows the owner/user to make assumptions regarding the many variables
affecting the cost of a piece of equipment. It must be appreciated that the ACTUAL
overall costs will not be known until the day the piece of equipment is actually sold or
scrapped (IF adequate records have been kept throughout the equipment ownership).
Costing therefore depends on good record keeping and a realistic appreciation and
assessment of a range of important historical, current and future factors.
The system intends to highlight the real costs of financing and ownership which are
neglected in many equipment management systems, and which can dwarf operating
costs in a high-cost-finance environment; thus possibly adversely affecting
management decisions on choice of technology or equipment. Whereas finance may be
obtainable at about 10% (or less) per annum in economically developed countries, they
may be many times higher in developing economies6.
Failure to take sufficient account of and provision for financing and ownership costs will
ultimately lead to severe problems when it becomes necessary to replace the
equipment.
Costs are particularly sensitive to annual utilisation as Tables A & B show in the Cost
Models in PART 2. Whereas many equipment items are designed to achieve annual
utilisation of 1,000 to 2,000 hours of work for economic ownership, significantly lower
utilisation can be extremely expensive and un-economic. The costing system
demonstrates that for most road works in developing countries the operating
environment is particularly unfavourable to the use of sophisticated plant.
The costing system should allow contractors to quickly assess the effects of various
assumptions or scenarios and how this will affect their income, outgoings and profits.
For small or unpowered items of equipment a daily, rather than hourly, cost rate is
appropriate throughout the calculations. All cost sheets end up with a calculated daily
rate. The following instructions are detailed for calculations based initially on an hourly
cost rate.
To carry out the costing exercise, the following input data is required:
Equipment Item procurement cost (New or second hand)
Expected duration of ownership in years (economic life)
Expected value on disposal after ownership, or scrap value
Expected annual productive utilisation (in hours or days)
Assumed number of productive hours utilisation per day (except small items)
Finance or Opportunity Cost of capital deployed (as an annual interest rate)
Estimate or record of value of spares consumed per year for the equipment item
compared to cost new and reduced to a daily charge
6 MART Working Paper No 2 (1997) reports bank interest rates of 15 - 48 % per annum in the
developing countries surveyed.